Work and road closures

Roadworks and road closures in and around Son en Breugel can be found here. 

Wilhelminalaan partially closed due to network reinforcement work

What: Partial closure of Wilhelminalaan due to grid reinforcement work
Where: Wilhelminalaan
When: Mid-January to mid-February 2026

Please note that work will commence on Wednesday, January 14, 2026.

For up-to-date information, download the Bouwapp for free from Google Play or the App Store.

  • There is one-way traffic on Wilhelminalaan.
  • The passage towards Veerstraat is open, but there is a diversion towards the city center. Follow route C (not all navigation systems provide a good diversion route). See also the map below showing the diversion.
  • Pedestrians can still pass through in both directions.
  • Dommel Street is closed.
  • Oranjestraat will become a one-way street towards Wilhelminalaan.
  • During this work, various side streets will also be closed in different phases.
  • Immediate neighbors will be informed by means of letters to residents. 

A detour has been set up for through traffic.

Grid reinforcement Son en Breugel: work in neighborhoods

What: Replacing and upgrading power lines in Son and Breugel
Where: In the neighborhoods in Son and Breugel.
When: as of April 2025 

Details

Enexis Netbeheer is going to expand the power grid in Son en Breugel. Together we are generating more and more sustainable energy with, among other things, solar panels and we are using more power for electric cooking, electric driving or a heat pump. Not only in Son & Breugel, but throughout the Netherlands. The electricity grid as constructed in the past is not equipped for this. This requires new, stronger cables in the ground. Enexis is proactively expanding the power grid to prevent problems. We call this 'network reinforcement'. By strengthening the grid, the electricity supply remains reliable and safe for residents and businesses. Enexis and the municipality are working together on this. The work will be carried out by Hurkmans and Hanab.

New power cables have been laid from Thermaelaan in Son to Ekkersweijer in Best. At the spot where the extra power cables are being laid, the forest edge will be rearranged at the same time and thus considerably improved.

From April 2025, part of the power grid in the neighborhoods in Son and Breugel will also be replaced and expanded. The work consists of:

  • Improving or renovating existing power houses. This is done inside the power houses and is not visible from the outside;
  • The installation of new power houses;
  • Excavation to replace and reinforce cables, in the street and under the sidewalk. 

All work can be followed via the Construction App. Download the construction app via the Google Playstore / App Store or scan the QR code: