Public decision list Feb. 21, 2024
Present:
Suzanne Otters-Bruijnen, mayor
Jan Boersma, Alderman
Steven Grevink, Alderman
Jeroen Wesselink, secretary
Absent:
Jelle de Jong, Alderman
1 | Public decision list Municipality of Son and Breugel Feb. 6, 2024The college adopts the decision list |
2 | Overview of decisions taken in mandate week 8 2024The college is periodically informed of decisions made in mandate. The summary includes decisions made on behalf of the college or the mayor in the past period.
|
3 | Internal-not-public-decision list Feb. 6, 2024The college adopts the decision list |
4 | Political Evening Feb. 22, 2024The college discussed the program of the Political Evening of February 22, 2024 and the list of commitments of the council of council December 21, 2023. |
5 | Advisory session Mobility planThe municipality is in the process of creating a Mobility Plan. The Mobility Plan contains our vision on mobility and how we want to give substance to this vision. For our vision, we are in line with the Regional Mobility Vision 2040 that is being drawn up, but we place our own accents. The Mobility Plan lays down how we can improve safety, livability and accessibility in the future. This includes looking at the desired layout of our roads for car traffic, cyclists, pedestrians and public transport. Besides the layout of roads, we also look at the current and desired behavior of road users.
|
6 | Appropriation increase redesign of environmental streetFollowing the council decision taken on June 22, 2023 "Future-proof environmental street", further elaboration of the sketch design into a Definitive Design has taken place, a Descriptive Document has been prepared and a management estimate has been prepared on this basis. Because the desire is for modular and circular construction, there are changes from the June 22, 2023 council proposal. The circular building leads to a higher investment amount, but lower capital costs. The college submits the credit increase to the city council.
|
7 | Abuse and improper use policyWith the introduction of legitimacy accountability, the college accounts for, among other things, the abuse and improper use criterion. The policy concerns the prevention of abuse and improper use of municipal property and (financial) regulations. The BBV Committee recommends that an overarching policy be drawn up for these management measures.
|
8 | Variant study of access A. Jansen BV, Kanaaldijk Zuid 24On August 24, 2022, the Administrative Law Division of the Council of State annulled the zoning plan "Ekkersrijt; Jansen Kanaaldijk Zuid 24" in its entirety. In doing so, the Council of State ordered us to make a new decision within 52 weeks and announce it in the manner prescribed by law. In order to comply with this, a study of various access variants for the business premises at Kanaaldijk Zuid 24 was carried out. Based on this variant study a careful consideration was made and it is proposed to maintain the access to the plot Kanaaldijk Zuid 24 via Terraweg.
|
9 | Outcome risk analysis Child Care Act 2022The Education Inspectorate performs an annual risk analysis on the municipal accountability for supervision and enforcement of childcare. The municipality is informed of the outcome by letter. College Decision:
|